In order to achieve AMBASSADOR targets, the project is divided into nine Work Packages (WPs), each targeting different objectives, tasks and expected results.
Leader: Jean-Louis Bergerand (Schneider Electric)
|
WORK PACKAGE 1: SYSTEM SPECIFICATIONS AND REQUIREMENTSDEMIS overall requirement, test scenarios played on the pilot sites, global high levelarchitecture, object model and data model will be described in this work package, the main exchange flow will be described at high level. The aim of this WP is to give the perimeter and the common framework of the project. The detailed specification will be produced in the corresponding technical WP. Public deliverables:
|
Leader: Pierre Bernaud (CEA-INES) |
WORK PACKAGE 2: DISTRICT / BUILDING SIMULATION ENVIRONMENTThe objective of the Work Package 2 is to develop a full simulation environment including building (envelop, electricity and energy usage) and district simulation model. |
Leader: Martin Sénéclauze (CSEM)
|
WORK PACKAGE 3: SYSTEM INTEROPERABILITY & COMMUNICATIONWork Package 3 concerns the design, architecture, and realization of the network that will interconnect the DEMIS to:
Public deliverables: |
Leader: Susana Lopez (Tekniker)
|
WORK PACKAGE 4: ENERGY PRODUCTION, STORAGE AND TRANSPORTATIONWithin WP4, the following items will be developed:
|
Leader: Yves Stauffer (CSEM)
|
WORK PACKAGE 5: BUILDING ENERGY MANAGEMENT AND INFORMATION SYSTEMNovel concept for building energy management will be developed in WP5, involving:
|
Leader: Laurent Battini (Schneider Electric) |
WORK PACKAGE 6: DISTRICT ENERGY MANAGEMENT AND INFORMATION SYSTEMDEMIS architecture will be defined and implemented in WP6. Optimization algorithms will be developed in order to propose energy strategies at district level. These algorithms will be implemented into an platform and connected to district actors. Tests will be carried out using a test platform of WP5. |
Leader: Antonis Peppas (NTUA) |
WORK PACKAGE 7: VALIDATION TESTSThe aim of the WP7 is to equip the identified validation sites to receive the AMBASSADOR system according to the defined scenarios; to run the test scenarios; to collect test data; to analyse test data so as to assess the AMBASSADOR system. |
Leader: Lenka Bajarova (AMIRES) |
WORK PACKAGE 8: PUBLIC AWARENESS AND RESULTS EXPLOITATIONWP8 is dedicated to the exploitation of AMBASSADOR results and their dissemination through the project website, publication in journals, presentation at conferences etc. and through organisation of AMBASSADOR final conference. Tutorials and summer school will be established during the course of the project. New business model will be developed and contribution of AMBASSADOR to standards will be considered. Existing state of energy management at building and district level will be also assessed. |
Leader: Alfredo Samperio (Schneider Electric) |
WORK PACKAGE 9: FINANCIAL AND ADMINISTRATIVE MANAGEMENTThe aim of the WP9 is to coordinate the actions of participants and progress monitoring for achievements of AMBASSADOR goals including financial and administrative management and reliable interface to the EC services and external actors (EAB). |